Saturday 31 August 2013

Day 41

The walls without their arches

Close up of the walls

Walls from above, they still need covering

Friday 30 August 2013

Day 40

The start of the walls around the waterfront

The waterfront from above to show the lighthouse, walls, path, jetty as they currently stand

The walls from the path, there will be a gate dead ahead toward the shacks

Thursday 29 August 2013

Day 39

Straightened out the path

Build the light house

The lighthouse from the path

The wooden jetty

Wednesday 28 August 2013

Day 38

The base of the tunnel entrance

The hillside once the tunnel is underneath. I had to cover up the parts that burst out of the ground

The tunnel entrance

The tunnel, it is a Z shape as it was easier for me to connect up




The tunnel entrance from behind

Tuesday 27 August 2013

Day 37

This is the beginning of the towers of the tunnel that takes you to the imperial city from the docks.

Monday 26 August 2013

Sunday 25 August 2013

Day 35

Th ground is now all level and i have built a path across from the light house

Path looking toward the light house

And looking away

Saturday 24 August 2013

Day 34

Adding layer 3

How the isle now looks from the side

Day 33

Adding the extra land that we had lost from the high sea level

Now adding the second layer which had disappeared be the raising of the bottom layer

First two layers complete only one layer left to add then the land will be complete

Thursday 22 August 2013

Day 32

Just a little today, started the paths and the base of the lighthouse

Side view of the paths and foundations

Wednesday 21 August 2013

Day 31

Banners on the arch mage's tower

The work from yesterday shown from above

An un-edited waterfront

The inner semi-circle where the path will be

The lighthouse base as well as the land needed to connect the waterfront to city isle (when the map of Tamriel was generated it was made with the water level 1 block too high)

Tuesday 20 August 2013

Day 30

Gate to the university

Barrels and walls in-between the buildings

The well out the front on the right

Path out the front looking towards the centre steps

Well on the left

looking into the wells

Monday 19 August 2013

Day 29

The flower garden in the university

Flower garden from the steps

Practice Rooms

Mage Quarters

Mystic archives

Praxographical center

Steps up on the left side
Steps up on the right side

All 6 buildings now complete from above


Sunday 18 August 2013

Day 28

The university from above, 2 of the 6 buildings are done. the wall that divides the front and back and a recolour to the dome roof

The back door to the arch-mages tower

The Lustratorium

The Chironasium

The new roof for the dome, because I think this is a better colouring

Front doors to the university

A close up of one of the gates to the university. Open because I think that is how the university should be

Centre steps at the back of the university