Monday, 29 July 2013

Day 8

Steps added to the path, to make it better to walk on

The bridge to the city is now complete

All three arches in view from the Imperial city end

View from above

Bird's eye view of the completed inner walls. the tops have been added as well as the gap filled so none of the inside messiness can be seen

Ground view of the tops of the walls completed today

The door of Harriet's white gold tower
The door open, using a piston mechanism. the door is 3x2 blocks and sits a total of 3 blocks deep and 8 block wide to include and cover mechanism

The white Gold Tower, now with doors and banners. Also the gold on the roof has been redesigned a little

Inside of the tower, because it looks impressive

No comments:

Post a Comment